Traditional ERP MRP systems minimize nominal expected landed cost, converging on 100% single-sourcing from the lowest-cost offshore foundry via the lowest-cost maritime corridor. Under tail geopolitical or seismic disruptions, single-sourced networks suffer catastrophic stockouts.
VaR95 and CVaR95 (Expected Shortfall) (src/chronos_mesh/risk/montecarlo.py) paired with Simchi-Levi’s Time-to-Recover (TTR) vs. Time-to-Survive (TTS) contagion metric (src/chronos_mesh/graph/topology.py).