In automotive and heavy-machinery manufacturing (e.g., SAP S/4HANA PP/MM multi-plant networks), Tier-1 assembly disruptions rarely originate at Tier-1. Instead, shared Tier-2/Tier-3 upstream components (such as 7nm automotive wafers feeding both powertrain MCUs and hydraulic valve drivers) create diamond-graph Bill-of-Materials (BOM) dependencies. Furthermore, textbook safety-stock formulas that assume constant lead times systematically underestimate buffer requirements during maritime corridor blockades, where transit variance explodes.
SupplyChainGraph.explode_bom):
Tier-3 Raw Silicon -> Tier-2 Foundry -> Tier-1 Subassembly -> Final Assembly) and accumulates gross component requirements across shared upstream nodes rather than tree-assuming single paths.100 units of POWERTRAIN-ECU-X9 require 200 MCU-MODULE-A1 (3x wafer dies each) and 400 VALVE-DRIVER-B2 (1.5x wafer dies each), converging on 1,200 WAFER-DIE-7NM units upstream.compute_safety_stock):
TTS) computation.TTR > TTS contagion alerts.500-trial Monte Carlo CVaR95 engine (src/chronos_mesh/risk/montecarlo.py).